Progress on the Opera House 2nd floor

by

 

Great Progress for the Opera Hall and Community Center.

It was a big week this week on the 2nd floor. We got all new, high efficiency low-E windows, R-30 Fire-rated insulation and two 120K BTU Furnaces.    I am now a strong proponent of proper insulation.   This space is warm, on the verge of hot, just from the heat coming from the fist floor furnaces.    What difference!

Photo Descriptions –

(left – how we bought it)  Empty hall, no drywall or ceiling. holes and missing window panes.
(center – starting work 2 weeks ago) Cleaned up existing wiring, starting the drywall.
(right – almost done )  HVAC installed, Drywall mudded, insulation it and all new windows.